En-suite renovation in Monkston Park

Project Info

  • Construction Date

    May 28, 2019

  • Duration

    approx. 3 month

  • Location

    Monkston Park

We were contacted by this customer regarding the en-suite renovation having been recommended by one of our existing customers. After a few design considerations, agreement was reached and the start date was agreed.

During the project we carried out the following work:

  • all existing fixtures and tiles removed
  • ceiling removed
  • re-wired for new spot lights and extractor fan with timer
  • new ceiling installed, plastered and painted
  • shower area tanking system applied
  • shower tray lowered
  • position of the toilet and sink changed
  • all pipes hidden in the wall
  • the shower mixer moved
  • towel rail radiator installed
  • full tiling and painting of the door and window

Our customer assures us that he is very happy with the work.

This project involved: bathroom designer, bathroom fitters, electricians, plumber, plastering service, tiler, painter and decorator. The project was completed in Monkston Park in Milton Keynes in 2019.