Master Bathroom Renovation in Furzton

Project Info

  • Construction Date

    July 1, 2019

  • Duration

    approx. 3 month

  • Location

    Furzton

This project was carried out as part of a large property renovation.
We have completely redesigned the master bathroom by creating a new door into the master bathroom and blocking one of the existing ones, moved all the plumbing to the required locations, new electrics etc.
The bathroom has two doors and we introduced electronic locking system with indications and safety features so that both doors would lock automatically when the bathroom is in use.
The bathroom has many other features like built-in-wall cabinet, solid surface with built-in lights, extra LED lights in the shower area, walking-in shower with easy controls etc.
It was completed in 2017.