Master bathroom renovation in Peartree Bridge

Project Info

  • Construction Date

    April 27, 2019

  • Duration

    approx. 3 month

  • Location

    Peartree Bridge

Hannah contacted us after she bought a new house and wanted to create her dream bathroom. It took 33 design considerations before coming up with this gorgeous looking bathroom; among everything else we had to consider product availability and colour matching everything including shower, tap, radiator, tiles and all the furniture.

To accommodate the new design we had to make radical changes to the original layout of the room: we changed the position of the toilet, sink, created a new shower waste connection, moved the extractor fan and the repositioned the towel rail. Even today we believe it is one of the best looking bathrooms we have created and Hannah was very happy with our workmanship and service.

This project involved: bathroom designer, bathroom fitters in Milton Keynes, electricians, plumber, plastering service, tiler, painter and decorator. The project was completed in Milton Keynes in 2014.